This job was finished the end of 2015.  It has a walk out basement which makes it like a 3 story from the back, and a 2 story from the front.  Possibly the most difficult foundation DCH has done to date.  

The very beginning of the project. We had to start the foundation way down the hill.  We had 3" on either side of the home to make sure we did not go ever the build lines. 

Custom railing was done by Ornamental Iron.